10/2000
INDIANA HARBOR BELT RAILROAD COMPANY
CIRCULAR NOTICE
NO. 63
TO: TRAIN & ENGINE EMPLOYEES OCTOBER 1, 2008
Safety Rule 1710(e) - Application in
Yard Switching Operation
Be governed by the following
interpretation of Rule 1710(e) from the S7A Safety Rules for all Train &
Engine Employees:
"3 Step" protection
required before fouling by yard crew members in Rule 1710(e) may be requested
using "Short Radio Identification" outlined in NORAC Rule 710.
Example:
Conductor: "9218, stop and 3 step requested, over."
Engineer: "Roger,
9218, stopped and 3 step applied, out."
The engineer must provide
"3 Step" protection before acknowledgment is transmitted. Safety Rule 1710(e) does not require a
separate radio request for the three actions required by "3 Step"
protection, but positive identification using engine number and acknowledgment
by the engineer are both required.
D.D. Kelley
Transportation
Superintendent